Taizhou Haoxin Electric Machinery Co., Ltd
Taizhou Haoxin Electric Machinery Co., Ltd
Your present position:
Homepage
-
-
-
Railway transportation capacity continues to lean towards thermal coal this year

Railway transportation capacity continues to lean towards thermal coal this year

  • Categories:company news
  • Author:
  • Origin:
  • Time of issue:2017-07-03
  • Views:7

(Summary description)In order to ensure the supply of thermal coal during the peak summer period of this year, the railway transportation capacity will continue to tilt towards thermal coal this year, using the newly increased capacity after the speed increase, strengthening the transportation organization, and improving the efficiency and level of unloading. The Ministry of Railways requires all units to pay close attention to the dismantling of vehicles. The stations should be quickly resolved, fast-fetched and fast-delivered, speed up the turnover of vehicles, and implement measures that give priority to the transportation of electricity and coal.
After the sixth large-scale speed increase and map adjustment of the railway, a batch of harmonious high-power locomotives and 70-ton large-tonnage trucks and other new technical equipment have been put into operation, and the coal transportation capacity of some lines has been significantly improved.

Railway transportation capacity continues to lean towards thermal coal this year

(Summary description)In order to ensure the supply of thermal coal during the peak summer period of this year, the railway transportation capacity will continue to tilt towards thermal coal this year, using the newly increased capacity after the speed increase, strengthening the transportation organization, and improving the efficiency and level of unloading. The Ministry of Railways requires all units to pay close attention to the dismantling of vehicles. The stations should be quickly resolved, fast-fetched and fast-delivered, speed up the turnover of vehicles, and implement measures that give priority to the transportation of electricity and coal.
After the sixth large-scale speed increase and map adjustment of the railway, a batch of harmonious high-power locomotives and 70-ton large-tonnage trucks and other new technical equipment have been put into operation, and the coal transportation capacity of some lines has been significantly improved.

  • Categories:company news
  • Author:
  • Origin:
  • Time of issue:2017-07-03
  • Views:7
Information
In order to ensure the supply of thermal coal during the peak summer period of this year, the railway transportation capacity will continue to tilt towards thermal coal this year, using the newly increased capacity after the speed increase, strengthening the transportation organization, and improving the efficiency and level of unloading. The Ministry of Railways requires all units to pay close attention to the dismantling of vehicles. The stations should be quickly resolved, fast-fetched and fast-delivered, speed up the turnover of vehicles, and implement measures that give priority to the transportation of electricity and coal.
       After the sixth large-scale speed increase and map adjustment of the railway, a batch of harmonious high-power locomotives and 70-ton large-tonnage trucks and other new technical equipment have been put into operation, and the coal transportation capacity of some lines has been significantly improved.
Keyword:

Scan the QR code to read on your phone

Previous: None
Next: None
Previous: None
Next: None

CONTACT INFORMATION

Eastside of Xingyuan Road, Gaogang Science and Technology Industrial Park, Taizhou City, Jiangsu Province, China

MOBILE VERSION

HaoXin Electric Power

ONLINE MESSAGE

Username used for comment:
客户留言
Description:
验证码

Taizhou Haoxin Electric Power Machine Co., Ltd.       苏ICP备14058652号-2        Powered by:300.cn

Haoxin Electric Machinery